Integrated Lift Solutions make good works at KC tool hire

Back

Integrated Lift Solutions complete second lift at the Sainsbury’s car park at the Forum in Horsham.

KC Hire

In October 2017 Integrated Lift Solutions were asked to undertake some making good works at KC tool hire in Liverpool.

Works included;

  • Infill between new architraves and existing shaft walls in stud work & 15mm fire-line board & MDF linings. Fix architraves & decorate comprising of undercoat and 2 coats of gloss to woodwork                  
  • making good to flooring using concrete
  • Infill redundant lift entrance with internal leaf of block work
  • Remove existing outer leaf of blockwork and infill tying in with internal skin and structure itself

 

For more information on Building Services for the Lift Industry, call 01484 303204 or complete our free survey form below.

Free Survey

 

Thank you for contacting Integrated Lift Solutions.
A member of our team will contact you in the next 2 working days.